
Free buyer tool
Compare supplier quotations, side by side
Put competing offers on one sheet. Check the price, the details and the questions you still need answered before you choose a supplier.
Illustrative image — not a photo of our premises or a client's.
Your quotation comparison
One product, one unit of measure, up to five suppliers. Start with the offers you have.
Scroll across to compare offers. Blank details appear in the follow-up checklist.
Edit one offer at a time. The summary below compares all suppliers.
| Quotation detailsRecord the supplier’s actual offer. | |
|---|---|
| Unit pricePrice for one unit, in the quoted currency. | |
| Minimum order quantityUse the unit of measure above. | |
| Quoted specificationsMaterial, size, finish and packaging. | |
| Production lead timeWhole days after deposit and specification approval; excludes transit. | |
| Payment termsDeposit, balance, timing and method. | |
| Shipping termSelect the term stated in the quotation. | |
| Named place or portInclude the country and agreed Incoterms edition in notes. | |
| Notes / quote referenceQuote date, validity, exclusions or a different lead-time basis. | |
| Goods subtotalTarget quantity × unit price. Only shown when the target meets the quoted MOQ. | —Enter price, MOQ and an eligible target quantity. |
| Choose for cost estimateSelection is your choice. Enter a price, MOQ and eligible target quantity first. |
Supplier 1
- Price:
- Not provided / invalid per pieces
- MOQ:
- Not provided pieces
- Production:
- Not provided
- Shipping:
- Not provided
- Specifications:
- Not provided
- Payment:
- Not provided
Supplier 2
- Price:
- Not provided / invalid per pieces
- MOQ:
- Not provided pieces
- Production:
- Not provided
- Shipping:
- Not provided
- Specifications:
- Not provided
- Payment:
- Not provided
Follow-up checklist
16 items to clarify
Use these questions to complete each offer. Review specifications against your requirements yourself.
Supplier 1
- Supplier name is missing.
- Unit price is missing.
- MOQ is missing.
- Specifications are missing.
- Production lead time is missing.
- Payment terms are missing.
- Shipping term is missing.
- Named shipping place or port is missing.
Supplier 2
- Supplier name is missing.
- Unit price is missing.
- MOQ is missing.
- Specifications are missing.
- Production lead time is missing.
- Payment terms are missing.
- Shipping term is missing.
- Named shipping place or port is missing.
Quotation details are not submitted to SinoBridge. Use Save draft to recover work after refreshing, or download or copy your comparison before leaving.
Make sure the offers cover the same thing
- Match the specifications
- Compare material, dimensions, finish, tolerances and packaging against the same requirement. Entering a specification does not confirm that it matches.
- Check the price basis
- Use the same unit of measure. Different currencies stay separate; this tool does not apply exchange rates or rank offers.
- Confirm the timing
- Enter production days after deposit and specification approval. If a supplier uses another starting point, explain it in notes. Transit time is separate.
- Compare the shipping scope
- Record both the shipping term and its named place or port. An EXW price and a FOB price cover different costs, even in the same currency.
The checklist flags missing fields and MOQs above your target. It cannot verify a supplier, judge product quality or confirm that quoted terms are accurate. Goods subtotals exclude freight, duty, tax and other fees.
Keep the comparison moving
Need help checking the offers?
Send the quotations, your product requirements and destination. We can help identify the details to confirm with each supplier.
