Guide
Insulated Glass Unit Specification for Foshan Windows
Insulated glass unit specification for China-sourced windows fails when schedules say only “double glazing.” Foshan fabricators need a written IGU build-up tied to each opening.
Quick answer
Insulated glass unit specification for Foshan windows means the full build-up on every schedule line: lite thickness, spacer, gas fill, low-e side, and toughened or laminated safety type. “Double glazing” on a quote is not a spec. Match IGU weight and performance to the frame system and confirm destination rules with your architect and import adviser before production.
Published: November 15, 2026By Abdullah Jahid, Founder, SinoBridge, based in Foshan, Guangdong
Why is “double glazing” not enough?
Suppliers often abbreviate glazing on quotations. Buyers who accept that shorthand inherit incompatible glass weight, wrong coating orientation, or missing safety glass for balconies and doors. An insulated glass unit (IGU) is a sealed assembly — two or more lites, spacer, desiccant and seal — whose exact makeup changes handling, warranty and performance.
What belongs on an IGU schedule line?
| Element | Write on the schedule | Why it matters |
|---|---|---|
| Outer lite | Thickness and type (clear, tinted, etc.) | Wind load and coating compatibility |
| Inner lite | Thickness and safety class if required | Human-impact and door regulations |
| Spacer | Material and cavity width | U-value claims and edge seal life |
| Gas fill | Air, argon or as quoted | Performance vs handling tolerance |
| Low-e | Surface position (e.g. #2) | Wrong side negates solar control |
Link each line to a window reference from approved shop drawings. If glass is procured separately from the frame shop, both purchase orders must carry the same notation.
How do I specify safety glass correctly?
Toughened, heat-soak-treated or laminated requirements depend on opening type, height and local rules — not on what looks fine in a showroom. Name the safety class on the schedule and on inspection checklists. Do not assume a domestic sales label maps to your building code.
This guide supports sourcing discipline. It is not structural engineering advice. Confirm safety glazing and wind design with your architect and destination advisers.
Who makes the IGU — fabricator or glass plant?
Some Foshan window plants glaze in-house; others buy sealed units from a glass processor. Ask who warrants seal failure, who inspects units before glazing-in, and how replacements work if transit breaks a pane. Pre-installed glass changes crate size and site handling compared with knock-down frames.
What should inspection check on IGUs?
- Unit labels match approved schedule references
- Edge seals uniform; no fog or primary seal gaps
- Chips, scratches or delamination within agreed limits
- Crating protects corners; glazing-in units have bar protection
IGU specification FAQs
What should an insulated glass unit specification include?
Can the window fabricator and glass processor be different suppliers?
Does low-e glass from China automatically meet my project?
What should pre-shipment inspection check on IGUs?
Tiles & building materials
More guides on this topic
Buying tiles from Foshan: what to check
Buying tiles from Foshan: what to check on grade, shade lots, packing and samples before you place a ceramic or porcelain tile order for export.
Foshan building materials sourcing guide
Where to source tiles, sanitary ware, aluminium windows, stone and lighting around Foshan, and how project buyers combine them Written for overseas buyers.
Chinese tile grades explained: AAA, first choice and carton markings
What Chinese tile “AAA” and “first choice” labels usually mean in trade — and how to check cartons without treating marketing grades as law.
Need IGUs specced with your Foshan window order?
Send window schedules, performance targets and destination. We reply with whether we can scope glass and frame checks under a written plan.
